Maharashtra Opens an SO2 Emissions Market: A Mass Cap, Metered Data and a Different Model from CCTS
The Maharashtra Pollution Control Board formally launched India’s first sulphur dioxide emissions market on 17 November 2026, two years after the state resolved to pilot it. The design caps mass emissions, reads them from continuous monitors and backs compliance with a cash deposit, three features that set it apart from India’s national carbon market, which prices greenhouse gases through intensity targets.
At a Glance · Maharashtra ETS-SO2
|
The market INDIA’S FIRST SO2 MARKET Formally launched in Mumbai on 17 November 2026 under a 2024 Government Resolution, run by MPCB with EPIC India and J-PAL South Asia. |
The design MASS CAP, METERED, DEPOSITED Permits are issued in zero net supply for kilograms of SO2 read by CEMS, and each plant lodges a trading deposit that is forfeited on a shortfall. |
The gaps CAP AND PLANT LIST UNPUBLISHED Neither the resolution nor the launch disclosed the cap, the plant list, the permit size or the compliance period. |
Maharashtra’s SO2 market takes a different approach from India’s national carbon market. Under the September 2024 resolution, selected plants receive permits against a fixed cap on the mass of SO2 they may emit. Their actual emissions are read from continuous monitoring systems, and missing data is treated as excess emissions. CCTS, by contrast, sets emissions-intensity targets for greenhouse gases, with nine sectors in scope and final targets notified for seven. The two schemes address different pollutants at different scales, so their approaches to compliance are not interchangeable.
The Surat particulate matter market, also developed with the University of Chicago and J-PAL, was run as a randomised trial and cut emissions by 20 to 30% against conventional regulation while lowering abatement costs by about 11%. Maharashtra has also spent nine years building its monitoring base, from the 2017 Star Rating Programme to the mock trading of this year. That groundwork matters, because an emissions market is only as reliable as the data used to measure compliance, and it is the part of the exercise that any compliance market can draw on.
The cap, the plant list, the permit size and the compliance period sit in a handbook that has not been published, so the market itself cannot yet be assessed, and a cap set at or above current emissions would produce no scarcity and no trades. Until the Market Oversight Committee publishes those parameters, Climate Decode treats the scheme as a design to study rather than a market to price.
|
1
|
The Launch |
The Maharashtra Pollution Control Board (MPCB) formally launched India’s first sulphur dioxide emissions market at an event in Mumbai on 17 November 2026, attended by the Minister for Environment and Climate Change, Pankaja Munde, the MPCB chairman, Siddhesh Kadam, and Michael Greenstone of the University of Chicago, who co-chairs the Emissions Market Accelerator that designed the scheme with MPCB.4,8 The minister put the aim at a 30% reduction in SO2 over five years and said that 17 industry categories are eligible, and the board and the University of Chicago Trust signed a separate memorandum the same day on AI-assisted inspection of industrial units.3,4
The state signed a memorandum with the University of Chicago Trust and J-PAL South Asia on 13 September 2024, and the Government Resolution establishing the pilot followed a week later. NCDEX e-Markets built the trading platform, launched in April 2026, and MPCB opened mock trading on it at an event on World Earth Day.1,2,5,8 The reports of 17 November describe the event as the pilot launch and do not say whether permits have been issued or any live trade made; a World Bank paper citing the programme had planned live trading from January 2026.4,11
|
2
|
Market Design |
The Government Resolution sets out a cap-and-trade market in the strict sense, in which MPCB issues a fixed pool of permits denominated in kilograms of SO2 to the selected plants. At the end of each compliance period a plant must hold permits at least equal to the mass it emitted, and plants that emit below their holding sell the balance to plants that emit above it. The resolution gives the example of a plant that emitted 35,000 kg against permits for 30,000 kg as out of compliance.1
Table 1 · ETS-SO2 design under the Government Resolution of 20 September 2024
| Element | Provision |
|---|---|
| Legal basis | Sections 17(1) and 18(1) of the Air (Prevention and Control of Pollution) Act, 1981 |
| Coverage | Select industries that are the leading SO2 emitters in the state, phased in; the plant list is not published |
| Traded commodity | Kilogram mass of SO2 as measured by continuous emissions monitoring systems (CEMS) |
| Permits | Issued by MPCB in zero net supply; allocated plus auctioned permits equal the cap; each permit a fixed quantity of SO2 |
| Compliance test | Permits held at the end of each compliance period must equal or exceed actual mass emitted in that period |
| Missing data | Missing or invalid CEMS data is deemed emitted at an increased rate; knowingly false data is penalised and deemed non-compliant |
| Deposit and penalties | A trading deposit at enrolment, forfeited in proportion to any shortfall; further financial penalties and Air Act action |
| Governance | A 10-member Market Oversight Committee chaired by the MPCB Member Secretary sets the cap, permit size, compliance period and deposit |
| Duration | Three years from the resolution, reviewed at 18 months, extendable by the committee |
Source: Government of Maharashtra, Government Resolution APC 2023/C.R.77/T.C.2, 20 September 2024.1
CEMS data, rather than a reported return, determines the mass emitted, and a gap in the data is deemed emitted at a higher rate, which removes any incentive to let a monitor fail. Each plant lodges a trading deposit at enrolment, forfeited in proportion to any shortfall, so the first penalty is taken from money already held, with financial penalties and action under the Air Act following for a shortfall that remains. The cap, the permit size and the compliance period are set by the Market Oversight Committee in consultation with MPCB, a body that includes the design researchers and the platform operator, rather than fixed in the resolution.1
Our India CCTS Market Watch tracks obligated sectors, intensity targets, notifications and the state of Carbon Credit Certificate trading.
Open Market Watch →|
3
|
The Surat Precedent |
Maharashtra is the second Indian state to adopt a market of this design. The first was Gujarat, where the Energy Policy Institute at the University of Chicago and J-PAL designed a particulate matter market for Surat with the Gujarat Pollution Control Board, launched in 2019 and described by its designers as the first of its kind for particulates anywhere, and later a second one for Ahmedabad.5,6 That market was run as a randomised controlled trial, with plants assigned to the market or to conventional regulation, and the published results in the Quarterly Journal of Economics found emissions 20 to 30% lower among market participants at abatement costs about 11% lower than under command-and-control.6,7
Maharashtra’s preparation ran longer than Surat’s because the state began with its data, the 2017 Star Rating Programme, designed with the same researchers, having put plant-level emissions data in public, and the designers cite the United States sulphur dioxide market, which cut emissions by 91%, as the model for a pollutant whose abatement, through flue-gas desulphurisation and fuel switching, is well understood and whose measurement by CEMS is routine.2,10
|
4
|
Comparison with CCTS |
For Climate Decode’s readers the relevant comparison is with the Carbon Credit Trading Scheme, which has nine sectors in scope, final intensity targets for seven of them covering 490 entities under the Greenhouse Gases Emission Intensity Target Rules, 2025, a draft for iron and steel and none yet for fertiliser, and which has yet to record a trade.9,12 The two schemes differ on the three points of design set out in Table 2.
Table 2 · Maharashtra ETS-SO2 and India CCTS compared
| Feature | Maharashtra ETS-SO2 | India CCTS |
|---|---|---|
| Pollutant | Sulphur dioxide | Greenhouse gases as CO2 equivalent |
| Target form | Absolute cap on mass emitted, permits in zero net supply | Emissions intensity per unit of output; absolute emissions may rise with production |
| Measurement | Continuous emissions monitors; missing data deemed excess emissions | Annual self-reported returns, verified by accredited agencies |
| Compliance unit | Permit for a fixed quantity of SO2 in kilograms | Carbon Credit Certificate for one tonne of CO2 equivalent |
| Enforcement | Trading deposit forfeited on shortfall, further penalties, Air Act action | Environmental compensation imposed by the Central Pollution Control Board at twice the year’s average certificate price; no trading price exists yet |
| Parameters set by | Market Oversight Committee with MPCB | Target rules notified by the Ministry of Environment, Forest and Climate Change under the Environment (Protection) Act; administered by the Bureau of Energy Efficiency |
| Status | Formally launched 17 November 2026; cap, plant list and trading start not published | Final targets for seven sectors, 490 entities; first compliance year FY2025-26; no certificate traded as of October 2026 |
Source: Government Resolution of 20 September 2024; Greenhouse Gases Emission Intensity Target Rules, 2025 and amendments; Climate Decode India CCTS Market Watch.1,9,12
An intensity target was the practical choice for CCTS, since the scheme grew out of the Perform, Achieve and Trade programme and India’s industrial output is expected to grow, but it means that a plant can comply while its absolute emissions rise and that the number of certificates in the market depends on production as much as on abatement. Absolute caps on carbon dioxide operate in the EU ETS, the UK ETS and the Western Climate Initiative, and intensity targets are used by China’s national ETS and by CCTS, so neither form is dictated by the pollutant. The Maharashtra resolution gives its reason for a market: most of the state’s industries already have pollution control equipment, mandating more would raise costs without reducing emissions, and a trading scheme reduces pollution at lower cost.1 The CCTS rules do not state a reason for the intensity form, which continues the structure of the Perform, Achieve and Trade programme from which the scheme grew. The measurement and enforcement provisions, metered data and a compliance deposit, do not depend on either choice.
|
5
|
Unpublished Parameters |
Neither the Government Resolution nor the launch material gives the cap, the participating plants, the permit size, the compliance period or the size of the trading deposit. The resolution leaves all of these to the Market Oversight Committee and to a handbook that EPIC India and J-PAL South Asia were to prepare, and MPCB’s website carried no notice of the launch at the time of writing.1 The minister’s figures of a 30% reduction over five years and 17 eligible industry categories are stated intentions, not notified parameters.3
A pool of permits set at or above current emissions produces no scarcity and therefore no trades, so the level of the cap will decide whether the market works. How a state permit market will sit alongside the national SO2 standards for thermal power plants has also not been explained in any published document. Those standards were narrowed on 11 July 2025, when the Environment (Protection) Fourth Amendment Rules exempted Category C plants, those more than 10 km from cities of over a million people, the National Capital Region and critically polluted or non-attainment areas, from the SO2 limits provided they meet stack-height rules; the exemption covers about 145 GW of the 204 GW identified for desulphurisation nationally, and no state-level figure has been published.13,14 Whether thermal power plants are among the industries selected for the Maharashtra market is not stated in any published document, and for an exempt plant that is selected, the permit cap would be the only SO2 limit that applies.
|
6
|
Developments to Watch |
The developments in Table 3 will show whether the design produces a market. The first is publication of the cap and the plant list, without which the scheme cannot be sized. The eighteen-month review provided for in the resolution would have fallen in March 2026 and has not been reported on.1
Table 3 · What to watch
| Development | Timing | Significance |
|---|---|---|
| Publication of the cap and plant list | Not announced | Whether the cap binds and how large the market is |
| First compliance period close | Not announced | The first evidence of trading volumes, prices and shortfalls |
| Eighteen-month review | Around March 2026 under the resolution; status unclear | Whether the pilot is extended beyond three years |
| Gujarat statewide SO2 market | In preparation | A second state market under the same design team |
| CCTS first trading session | Expected after the FY2025-26 compliance deadline | Whether the national scheme adopts metered data or deposits |
Source: Government Resolution of 20 September 2024; EPIC India; Climate Decode.1,5,9
The Emissions Market Accelerator is supporting Gujarat on a statewide SO2 market and Rajasthan on scoping, so three states may be running mass-based pollutant markets before CCTS completes its first compliance cycle.5 When CCTS trading begins, the Bureau of Energy Efficiency will have a working Indian example of metered compliance and deposit-backed enforcement alongside its own design.9
Climate Decode Platform
The CCTS targets and compliance dates compared in this analysis are tracked in the India CCTS market page, which follows obligations, notifications and the state of trading.
Obligated sectors, intensity targets, notifications and the state of Carbon Credit Certificate trading, in one place.
Open Market Watch →TerraNova brings activity data, decarbonisation planning and compliance-market positions together, so that a CCTS shortfall can be sized before trading begins.
Explore TerraNova →Notes
2 EPIC India, Maharashtra announces India’s first sulfur dioxide pollution market, on the memorandum, mock trading and the statements by Pankaja Munde, Siddhesh Kadam and Michael Greenstone. link
3 The Week, Industries must innovate and reduce pollution, not simply trade emission permits, says Pankaja Munde, 17 November 2026, on the 30% aim and the 17 industry categories. link
4 PSU Watch, Maharashtra announces country’s first sulphur dioxide emissions trading scheme, 17 November 2026, on the launch event and the memorandum on AI-assisted inspections. link
5 EPIC India, Emissions Market Accelerator, on the Surat, Maharashtra, Gujarat and Rajasthan programmes. link
6 University of Chicago, World’s first particulate matter trading scheme in Gujarat cut pollution by up to 30%, finds study, April 2025. link
7 Greenstone, Pande, Ryan and Sudarshan, Can Pollution Markets Work in Developing Countries? Experimental Evidence from India, Quarterly Journal of Economics, 2025.
8 Free Press Journal, Maharashtra to launch India’s first statewide SO2 emissions trading scheme on November 17, on the launch, the Emissions Market Accelerator and the NCDEX e-Markets platform. link
9 Climate Decode, India CCTS Market Watch, obligated sectors, notified targets and the state of trading, accessed 19 November 2026. link
10 Yale Economic Growth Center and International Growth Centre, Star power: Maharashtra starts rating industries by emissions, 2017, on the Star Rating Programme designed with EPIC and J-PAL. link
11 Deb, K., Emissions trading in India, paper for the World Bank, 2025, on the planned sequence for the Maharashtra scheme and the Surat results. link
12 Ministry of Environment, Forest and Climate Change, Greenhouse Gases Emission Intensity Target Rules, 2025, with target notifications G.S.R. 739(E) of 8 October 2025, G.S.R. 25(E) of 13 January 2026 and G.S.R. 794(E) of 7 September 2026, and the draft iron and steel targets G.S.R. 517(E) of 26 June 2026; summarised by Carbon Neeti, India’s CCTS compliance deadlines, October 2026. link
13 Ministry of Environment, Forest and Climate Change, Environment (Protection) Fourth Amendment Rules, 2025, 11 July 2025, on Category A, B and C thermal power plants; summarised by JSA, Prism Energy, July 2025. link
14 CareEdge Ratings, FGD implementation waiver: a breather for IPPs, 16 July 2025, on the 204 GW identified for desulphurisation (Ministry of Power, Rajya Sabha reply of 16 December 2024) and the roughly 145 GW in Category C. link
Sources
EPIC India: Maharashtra announces India’s first sulfur dioxide pollution market
The Week: Pankaja Munde interview, 17 November 2026
PSU Watch: Maharashtra announces SO2 emissions trading scheme
EPIC India: Emissions Market Accelerator
University of Chicago: Surat particulate matter market study
Free Press Journal: Maharashtra to launch SO2 emissions trading scheme
Climate Decode Market Watch: India CCTS
IGC: Maharashtra Star Rating Programme, 2017
World Bank: Emissions trading in India (Deb, 2025)
Carbon Neeti: CCTS compliance deadlines and notified targets
JSA: Environment (Protection) Fourth Amendment Rules, 2025
CareEdge: FGD implementation waiver, July 2025
This article describes a state emissions trading scheme from its establishing resolution and launch material and is not legal or investment advice. The cap, plant list, permit size and compliance period had not been published at the time of writing.
|
© 2026 Climate Decode · Market Analysis · Reference CD-CCTS-SO2 |
Series Home Insights Home Contact Us |